Archive for the ‘Dams/hydro’ Category

North Korea at night (2012-9-24)

Thursday, December 6th, 2012

Eric T. passes along this amazing satellite photo of the Korean peninsula taken at night on 2012-9-24:

The photo comes from NASA. Click image to see larger version.

When I get some time (maybe this weekend) I will see if I can put names to the lights in North Korea.

Here is the text from the NASA web page:

City lights at night are a fairly reliable indicator of where people live. But this isn’t always the case, and the Korean Peninsula shows why. As of July 2012, South Korea’s population was estimated at roughly 49 million people, and North Korea’s population was estimated at about half that number. But where South Korea is gleaming with city lights, North Korea has hardly any lights at all—just a faint glimmer around Pyongyang.

On September 24, 2012, the Visible Infrared Imaging Radiometer Suite (VIIRS) on the Suomi NPP satellite captured this nighttime view of the Korean Peninsula. This imagery is from the VIIRS “day-night band,” which detects light in a range of wavelengths from green to near-infrared and uses filtering techniques to observe signals such as gas flares, auroras, wildfires, city lights, and reflected moonlight.

The wide-area image shows the Korean Peninsula, parts of China and Japan, the Yellow Sea, and the Sea of Japan. The white inset box encloses an area showing ship lights in the Yellow Sea. Many of the ships form a line, as if assembling along a watery border.

Following the 1953 armistice ending the Korean War, per-capita income in South Korea rose to about 17 times the per-capital income level of North Korea, according to the U.S. Central Intelligence Agency. Worldwide, South Korea ranks 12th in electricity production, and 10th in electricity consumption, per 2011 estimates. North Korea ranks 71st in electricity production, and 73rd in electricity consumption, per 2009 estimates.

Share

DPRK power consumption at 1970s levels

Monday, August 6th, 2012

 

Pictured above: (L-Yonhap) Estimated energy consumption in the DPRK; (R) IEA graph of DPRK energy production

Statistics Korea published information on DPRK energy consumption originally published by the International Energy Agency. I have added a link to the IEA’s DPRK data on my DPRK Economic Statistics Page.

The original data is behind a firewall (as best I can tell), so here is coverage of the report in the Daily NK:

Based on International Energy Agency (IEA) documentation, the statistics, which were made public on the 6th via Statistics Korea’s ‘North Korea Statistics Portal’, reveal that per capita electricity consumption in 2008 remained just 819kWh, substantially lower than the 919kWh recorded in 1971.

The figures are just the latest symbolic indicator of the protracted economic decline that began in the 1990s, when the national economy collapsed following the fall of the Soviet Union and the sudden demand that the majority of fuel imports be paid for in hard currency.

Rooted in the provision of low cost fuel by its larger communist neighbors, North Korean electricity consumption had risen steadily until 1991. By 1980 it had reached 1114kWh per capita, a figure that rose again over the next decade to reach 1247kWh by 1990. However, by 1995 it had declined precipitously to 912kWh, and at its nadir in 2000 per capita usage figure was just 712kWh.

This decline was subsequently arrested; however, the following seven years (including 2004 (787kWh), 2005 (817kWh), 2006 (797kWh) and 2007 (762kWh)) reflected how the country was (and remains) unable to recover to the 1990 standard, with population growth outstripping improvements in electricity generation.

In 1971, North Korea had a population of just 14.6 million, but by 2008 this was estimated to have risen to 23.9 million.

Here is coverage in Yonhap.

Read the full story here:
Economic Collapse Reflected in Scarce Electricity
Daily NK
Kim Tae Hong
2012-8-6

Share

On DPRK efforts to join UN carbon market

Thursday, May 31st, 2012

UPDATE 14 (2016-12-8): The Pyongyang Times reports on the CDM project:

Various CDM projects obtain CERs

The UN Framework Convention on Climate Change CDM Executive Board recently issued certified emission reductions for the DPRK’s clean development mechanism projects.

Today many countries make great efforts to reduce greenhouse gas emissions as part of the worldwide bid to prevent global warming, the root cause of climate change.

The DPRK also proactively joins in the international efforts.

It signed the Kyoto Protocol, which took effect in 2005, and joined the Paris agreement on climate change signed by 174 countries in August this year.

The agreement, adopted at the UN Conference on Climate Change in Paris in 2015, is aimed at reducing the world’s greenhouse gas emissions to the maximum so that the global average temperatine would not rise more than 2 degrees over that in the 1850s, the pre-industrialization period.

As a signatory to the Paris agreement, the DPRK has worked out 2024 and 2030 greenhouse gas reduction plans and pushed ahead with them.

In keeping with the trend when the sales of carbon dioxide emission rights have emerged as CDM and CDM activities are brisk in the world environmental protection market, a non-permanent CDM committee has been set up in the Cabinet and the General Bureau for Cooperation with International Organizations of the Ministry of External Economic Relations plays the role of its secretariat.

While coordinating all CDM project activities in the country, the secretariat also undertakes issuance of CERs for various CDM project activities on the basis of agreements on cooperation for the development of CDM projects with CER buyers, Topic Energo of the Czech Republic and Ohana LLP, Britain.

In the course of this, several projects were registered as CDM projects by the CDM Executive Board. They include Ryesonggang Youth Power Station units 3, 4 and 5, Hamhung Youth Power Station unit 1, Kumyagang Power Station unit 2, Paektusan Hero Youth Power Station unit 2 and package projects for “Treatment of waste water from chemical factories in the DPRK” and “Collection and use of methane gas from coal mines in the DPRK”.

The secretariat ensured that Paektusan Hero Youth Power Station unit 2 and Ryesonggang Youth Power Station unit 4 obtained CERS for the first time after receiving international certification for their power generation in May.

Their CERs issued amount to 15 800 and 27 807 tons respectively.

The secretariat now works to achieve international certification of other registered CDM projects.

By Jong Hwa Sun PT

UPDATE 13 (2014-11-28): The Ryesonggang Youth Power Station No.4 has been completed. According to KCNA:

New Power Station Goes Operational

Kumchon, November 27 (KCNA) — Ryesonggang Youth Power Station No. 4 went operational.

President Kim Il Sung indicated the orientation of building the power stations on the Ryesong River. Leader Kim Jong Il visited the construction sites several times, setting forth tasks and ways for the construction and bestowing loving care and benevolence on the builders.

Marshal Kim Jong Un appreciated the achievements of the people in North Hwanghae Province when he visited Ryesonggang Youth Power Station No. 1. He not only took measures for finishing the construction of Ryesonggang Youth Power Station No. 2 by the concerted efforts of the army and people but also led the construction of Ryesonggang Youth Power Station No. 4.

The completion of Ryesonggang Youth Power Station No. 4 is another success in implementing the behests of Kim Il Sung and Kim Jong Il to settle the acute shortage of electricity in the North Hwanghae Province by building power stations on the Ryesong River. It also helped lay a more solid foundation for developing economy and improving the living standard of the people in the province.

The completion ceremony took place on Thursday.

Present at the ceremony were Tong Jong Ho, minister of Construction and Building-Materials Industry, Pak Thae Dok, chief secretary of the North Hwanghae Provincial Committee of the Workers’ Party of Korea, and others.

Here is KCTV footage (7:21). Here is UNFCCC data.

UPDATE 12 (2012-12-13): Robert Winstanley-Chesters has some additional data here.

UPDATE 11 (2012-11-25): The DPRK has registered four more power plants with the UNFCCC CDM project.

1. Paekdusan Songun Youth Power Station No. 2 (백두산선군청년2호발전소)
Registered July 13, 2012

Pictured Above (Google Earth): The approximate location of the Paekdusan Songun Youth Power Station No. 2

The UNFCCC documents on the registration of the power plant can be seen here.

Total installed capacity of the project will be 14 MW, consisting of two sets of 7 MW hydropower turbines and associated generators.

According to the UN documents, the project is expected to be put into operation on January 1, 2014.

The organizations listed on the document are the Namgang Hydropower Construction Complex and Topič Energo s.r.o. (Czech Republic)

2. Ryesonggang Youth Power Station No. 4 (례성강청년4호발전소)
Registered July 20, 2012

Pictured Above (Google Earth): The approximate location of the Ryesonggang Youth Power Station No. 4.

The UNFCCC documents on the registration of the power plant can be seen here.

The installed capacity of the project is 10 MW, which consists of 4 sets of generating facilities with a capacity of 2.5 MW each. The project will generate the electricity energy of 40,030 MWh and supply 38,640 MWh to the WPG in a year.

According to the UN documents, the project is expected to be put into operation on December 1, 2012. This facility was last featured on the DPRK evening news on 2012-11-8. See the footage here.

The organizations listed on the document are the Kumchon Electric Power Company  and Topič Energo s.r.o. (Czech Republic).

3. Ryesonggang Youth Power Station No. 5 (례성강청년5호발전소)
Registered August 22, 2012

Pictured Above (Google Earth): Construction work on the Ryesonggang Youth Power Station No. 5.

The UNFCCC documents on the registration of the power plant can be seen here.

The installed capacity of the project is 10 MW, which consists of 4 sets of generating facilities with a capacity of 2.5 MW each. The project will generate electric energy of 41,150 MWh and supply 40,616 MWh.

Organizations listed in the document include the Kangdong Hydro Power Construction Company and Topič Energo s.r.o. (Czech Republic).

According to the documents, the project is planned to be put into operation on May 1, 2012. The most recent Google Earth satellite imagery is dated Spetember 5, 2011 and the last time the project was featured on North Korean television was November 5, 2011. I am skeptical that the project was finished on time since the opening of the dam has yet to be announced publicly.

4. Ryesonggang Youth Power Station No. 3 (례성강청년3호발전소)
Registered October 23, 2012

Ryesonggang-power-station-no-3

Pictured Above (Google Earth): Construction work on the Ryesonggang Youth Power Station No. 3.

The UNFCCC documents on the registration of the power plant can be seen here.

The project with an installed capacity of 10 MW, 4 sets of generating facilities with a capacity of 2.5 MW
respectively. The project will generate the electricity energy of 42,800 MWh and supply the electricity of 41,310
MWh.

Organizations listed in the document include the Tosan Electric Power Company and Topič Energo s.r.o. (Czech Republic).

Though the plant is supposed to go into operation on July 1, 2012, the most recent Google Earth imagery from 2012-11-8 shows the plan remains uncompleted. The last time the plant was featured on North Korean television was 2011-6-25.

UPDATE 10 (2012-10-23): The DPRK has registered its second CDM project: Kumya Hydro Power Plant. (AKA Kumyagang Power Station No. 2, 금야강2호발전소)

Here is the official UN web page containing all of the technical information.

Here is a Google Earth satellite image featuring the dam and power station (39.552132°, 127.156062°):

Kumya-plant-2

The Hanns Seidel Foundation (Facebook page here) visited the site and took this photo:

KCTV footage dated 2014-9-16 shows a completed Kumya Hydro Power Plant (AKA Kumyagang Power Station No. 2). See the footage here.

UPDATE 9 (2012-8-16): The DPRK’s first CDM project registered: Hamhung Hydro Power Plant No. 1 (AKA Hamhung Youth Power Station No. 1)

Hamhung-plant-UNFCCC-Bing

Pictured above (date unknown): On Bing Maps (coordinates: 39.648086°, 127.269219°) we can see construction is underway

A valued reader notified me this morning that the DPRK’s first CDM project was registered in July: The Hamhung Hydro Power Plant No.1.

You can read more about the project on the UN web page here. As I understand it, the CER (the emissions rights) from the plant do not go directly to North Korea but to a Czech company who co-registered the project. It will become operational on January 1, 2013.

UPDATE 8 (2012-6-5): In addition to the seven power plants submitted for approval below, the DPRK is involved in several other “Programmes of Activities (POAs)“. You can see all the POAs by clicking here and selecting DPRK as “Host Country”.

Here is a summary:

1. Methane Utilization and Destruction Programme from Animal Waste Management System (AWMS) in DPR Korea

2. Methane Utilisation and Destruction Programme from Industrial Wastewater in DPR Korea

3. CarbonSoft Open Source PoA, LED Lighting Distribution: Emerging Markets

4. Coal Mine Methane Utilisation and Destruction Programme in DPR Korea

5. International water purification programme

6. CFL Lighting Scheme in Democratic People’s Republic of Korea (DPRK)

UPDATE 7 (2012-6-2): The creator of Nord Korea Info passed along the following information on the DPRK’s CDM projects:

1. Naenara, one of the DPRK’s official news outlets, has posted numerous CDM documents. You can see them here.

2. Information posted to the UNFCCC web page on specific CDM projects:

A. Kumya Hydropower Plant (AKA Kumyagang Power Staiton No. 2)
B. Ryesonggang Hydropower Plant No.3 (Comments) (AKA Ryesonggang Youth Power Station N. 3)
C. Ryesonggang Hydropower Plant No.4 (Comments) (AKA Ryesonggang Youth Power Station N. 4)
D. Ryesonggang Hydropower Plant No.5 (Comments) (AKA Ryesonggang Youth Power Station N. 5)
E. Paekdusan Songun Youth 14MW Hydropower Project No.2 (AKA Paektusan Songun Youth Power Station No. 2)
F. Wonsankunmin Hydropower Project No.1 (Comments) (AKA Wonsan Army People Power Station No. 1)
G. Hamhung Hydropower Plant No.1 (AKA Hamhung Youth Power Station No. 1)

No new information is available on the Hamhung 20MW Hydropower Plant No. 2 (AKA Hamhung Youth Power Station No. 2). So I am unsure what has happened to it.

UPDATE 6 (2012-5-31): Bloomberg Businessweek reports on the DPRK’s efforts to sell carbon credits:

[U]nder the terms of the [Kyoto] protocol, North Korea, as a developing country and a member of the United Nations, has the right to build clean energy projects that may apply for Certified Emission Reductions, or CERs, popularly known as carbon credits. The North Koreans can then sell them to a rich country or company that needs the credits to offset its own greenhouse gases. Dig into data from the UN’s Framework Convention on Climate Change, and you will find seven North Korean projects registered for carbon trading.

This is where Miroslav Blazek comes in. Blazek, director of Czech company Topic Energo, acts as a link between North Korea and potential carbon credit buyers. He says his experience as manager of a tractor factory in socialist-era Czechoslovakia is invaluable for doing business with the communist North Koreans. “I can work with them because I understand how their system works,” he says. “If I send an e-mail and still don’t have a reply in several days, I know it’s not because they didn’t see it but because it had to work its way through the chain of command. For me it’s like a trip down memory lane.”

North Korea is now building seven hydroelecrtric plants, which provide some of the cleanest energy going. Most can earn tradable carbon credits. Blazek says the North Koreans “jumped” at the opportunity to get into carbon trading: “They immediately grasped that this is a way to make money.” Korea’s seven dams may generate as many as 241,000 CERs a year, worth almost €1 million ($1.3 million). “The projects are already in a relatively advanced phase,” says Ondrej Bores, director of carbon advisory services at Virtuse Energy in Prague, who’s worked with Blazek on other deals.

Still, selling anything made in North Korea has its challenges. More than 30 potential buyers pulled out because of the U.S. embargo on trade with North Korea. Blazek finally struck a deal with a Chinese-controlled conglomerate that needs credits to offset emissions from facilities in Europe. He won’t name the company, citing a confidentiality clause.

The Prague Post also reported on this story.

UPDATE 5 (2012-2-14): I have been notified that the certification program is proceeding. From a reader:

There has been a statement by the 1718 committee (on sanctions) that CDM projects in NK do not violate UN rules.

[Seven] hydropower plants did get their validation and underwent a process of “clarifications and corrections” as foreseen by UN rules. After the final report (which might have been already issued or might be issued soon) they will go for final vote to the UNFCCC.

Currently, North Korea works on projects as diverse as methane gas from coal mines, bio-gas and electricity-saving light bulbs.

UPDATE 4 (2011-7-11): I just checked the UNFCCC web page, and it appears that in addition to the hydro power plants mentioned below, the North Koreans also submitted the “Energy Efficiency Improvement Project in Pyongyang Textile Factory” [sic] for carbon offsets on May 23, 2011. According to the UNFCCC web page, the project is in the portfolio of the Carbon-Trade Division, GBCIO, Ministry of Foreign Trade.

UPDATE 3 (2011-7-11): DPRK begins construction of Ryesonggang Power Stations 3 and 4

On June 25th the DPRK evening news featured footage of the construction of the Ryesonggang Youth Power Station No. 3 (례성강청년3호발전소). I have uploaded the footage to YouTube and you can see it here.

On June 28th the DPRK evening news featured footage of the construction of the Ryesonggang Youth Power Station No. 4 (례성강청년4호발전소). I have uploaded the footage to YouTube and you can see it here.

UPDATE 2 (2011-3-11): The DPRK has apparently registered eight power plants with the UNFCCC. According to Reuters:

North Korea has registered eight hydroelectric plants with the United Nations, and if approved, could allow the world’s most reclusive state to sell carbon offsets to earn precious hard currency.

These hydropower projects were registered with the United Nations Framework Convention on Climate Change (UNFCCC) for prior consideration in getting carbon credits, some of which have a capacity of 20 megawatts, the UNFCCC website showed.

Prior consideration is the first step for accreditation toward the U.N.’s Clean Development Mechanism that allows developing countries to earn tradeable carbon credits for emissions from clean-energy projects.

Bernhard Seliger, a messenger for North Korean officials on these projects, said the United Nations uploaded the information on Thursday after he submitted related forms on behalf of the North Korean government’s carbon trade division in late February.

“I have no idea when the U.N. makes a decision… North Korea has to finish the power plants, which up to now are only half-finished dams,” Seliger, Hanns Seidel Foundation’s representative in South Korea, told Reuters via email.

Analysts questioned the demand for carbon credits from North Korea, concerned the money might be siphoned off to nuclear arms or other military projects.

According to the UNFCCC web page (select Democratic People’s Republic of Korea in the “Host Party” box), these are the eight power stations that have been submitted for consideration:

Hamhung Hydropower Plant No.1 (AKA Hamhung Youth Power Station No. 1)
Hamhung 20MW Hydropower Plant No. 2 (AKA Hamhung Youth Power Station No. 2)
Kumya Hydropower Plant (AKA Kumyagang Power Station No. 2)
Paekdusan Songun Youth 14MW Hydropower Project No.2 (AKA Paektusan Songun Youth Power Station No. 2)
Ryesonggang Hydropower Project No. 3 (AKA Ryesonggang Youth Power Station N. 3)
Ryesonggang Hydropower Project No. 4 (AKA Ryesonggang Youth Power Station N. 4)
Ryesonggang Hydropower Project No. 5 (AKA Ryesonggang Youth Power Station N. 5)
Wonsangunmin 20MW Hydropower Project No. 1 (AKA Wonsan Army People Power Station No. 1)

And according to an email from the UNFCCC:

This list contains all the projects which have already started and for which a notification of CDM prior consideration has been submitted. This notification is necessary to prove that the incentive of the CDM was a decisive factor for taking up the project when a project has started before a project design document (PDD) has been published for global stakeholder consultation or a new methodology in connection with the project has been submitted. However, kindly note that these projects have not yet entered the CDM project cycle as lined out in the CDM rules, requirements and procedures, and to submission for registration has yet been made.

Further details on the CDM project cycle are available here: http://cdm.unfccc.int/Projects/diagram.html

UPDATE 1 (2011-3-8): According to the Guardian:

North Korea hopes to earn much-needed hard currency by selling UN-backed carbon offsets from a series of hydro-power projects, as the country faces sanctions over its nuclear weapons programme.

If approved and registered by the UN, these would be the first projects for North Korea under a scheme called the Clean Development Mechanism (CDM). This allows developing countries to earn tradeable carbon credits for emissions reductions from clean-energy projects.

Some analysts questioned the demand for carbon credits from North Korea, with fears the money might be siphoned off to nuclear arms or other military projects.

The government has asked the Hanns Seidel Foundation of Germany, which focuses on humanitarian issues, to act as a go-between by working with UN-approved verification agency TUV Nord.

According to Bernhard Seliger, the foundation’s representative in South Korea, North Korea is initially looking at trying to get approval for three hydro power plants of 7-8 megawatts (MW).

Seliger visited the three hydro-plant construction sites in the north-east corner of the country in January.

In a statement, TUV Nord confirmed the foundation had engaged their services.

“In this respect, TUV Nord intends to verify hydropower dams in North Korea once pre-registered with United Nations framework conventions on climate change [UNFCCC] via the Beijing branch of its Chinese subsidiary TUV Nord Guangzhou,” it said.

If registered, the plants could yield millions of euros over several years.

Beijing-based lawyer Tom Luckock, who specialises in projects that curb greenhouse gas emissions, estimated that an 8 MW hydro plant could yield about 23,000 UN offsets a year.

The offsets, called Certified Emissions Reductions (CERs), are generated from registered CDM projects, such as wind farms, that are rewarded for reducing greenhouse gas emissions.

The offsets currently trade at nearly €12 (£10) each and are bought by governments in rich nations that need to meet UN emissions reduction targets.

Europe is the biggest buyer, with large polluting firms allowed to buy the offsets to meet a portion of their emissions reduction targets under the EU’s emissions trading scheme.

“Finding ways to secure foreign currency is the priority for North Korea, which is linked to everything from food to raw material imports to boost reduced productivity,” said Cho Myung-chul, a senior researcher at the Korea Institute for International Economic Policy.

Seliger said North Korea, which signed the UN’s Kyoto Protocol climate pact in 2005, was also interested in biomass power generation projects under the CDM.

The UN-approved national agency that assesses and approves CDM projects in North Korea was not available for comment.

Questions remained on demand for North Korean CERs.

“Even if they open up, who in the world wants to pay for North Korea that is blamed for its nuclear weapons programme?” said Choi Soo-young, a senior researcher at the Korea Institute for National Unification.

Cho said the UN needed to prevent outside cash going into its nuclear development activities, while Luckock, of global law firm Norton Rose, said: “Their limited access to hard currency has to be a concern for buyers – the damages clauses will carry limited weight without some security there.”

Another challenge is that North Korea would have to make public its energy consumption and generation data and disclose information on the amount of energy linked to the hydro project.

“Annual inspection, constant measurement and energy flow posting on the [UNFCCC] website – all these things are new for North Korea,” Seliger said.

According to the AFP:

“We are talking about eight power plants, with the smallest size about 7.5 megawatts. These are not big projects but small or medium-sized projects,” Bernhard Seliger told AFP.

None has yet been completed, he said.

“I saw some (construction) sites in South Hamkyong province but that’s not all. There are other plants in other regions,” Seliger said, adding that some of the projects are led by the UN Development Programme.

The Hanns Seidel Foundation has been working since 2003 to build the North’s development capacity, and in 2008 organised a seminar on carbon trading for Pyongyang officials at their request.

The tradeable credits, called Certified Emissions Reductions, are awarded for approved clean-energy projects such as hydropower plants or wind farms.

Big polluters elsewhere in the world can buy them as part of their efforts to cut emissions.

Seliger said his foundation is helping the North to prepare for the auditing process required to join the UN carbon credit trading system known as the Clean Development Mechanism.

“One good thing about this project is that it is very transparent, involving monitoring and auditing on an annual basis… I think it is very good for North Korea to participate in such an international regime,” said Seliger.

An official at a South Korean state agency, the Korea Energy Management Corp, said registration would take at least a year or two and it was unclear how much the North would be able to earn if approved.

The official, who declined to be identified, said a typical eight-megawatt hydropower plant could yield about 19,500 carbon credits each year, each of which was currently traded at 12 euros in global markets.

This would amount to around $327,000 a year.

But some buyers may shun the communist state, given its history of nuclear and missile development which has led to international sanctions.

“Government buyers will certainly shy away from dealing with the North,” said Koo Jung-Han, a researcher at the Korea Institute of Finance.

“But private companies have few reasons not to buy credits from the North as long as it can offer a competitively low price. However, the big question is whether the North will be able to build the plants without outside financiers.”

Koo said that countries hoping to buy carbon credits from upcoming overseas projects often encourage investment in the ventures by their own finance companies.

“But what kind of financial companies will take a plunge in projects in such a volatile, politically risky country like North Korea?”

The North suffers persistent power shortages even in the showpiece capital Pyongyang.

Many rural areas receive power only during key agricultural seasons, and must rely for the rest of the year on alternative fuels, according to a recent policy paper published by the Nautilus Institute think-tank.

Here are the web pages for the Hanns Seidel Foundation and the UNFCCC Clean Development Mechanism (CDM) Program.

A reader writes in with the following comments:

I would like to share some comments on the potential CDM projects in north Korea as i have been working on this field for many years now.

Concerning existing hydro-power plants:
To be eligible as a CDM project, one of the first criteria is the additionality of the project. You have to prove (the rules are very strict) that the project would not have been launched without the consideration of the revenues from the reselling of the CERs. So the dams that have already been buit are not eligible.

Concerning hydro-power plants that are being implemented:
The first step of a CDM project is to notify to the UNFCCC secretariat and to Designated National Authority (in this case the Secretariat of the National Coordinating Committee of Democratic People’s Republic of Korea for Environment) that you are seeking to establish your project as a CDM project. Up to now, no such notification has been received by UNFCCC so it would be quite difficult for projects being implemented to ask for the CDM status (I mean nearly impossible).

Some facts concerning future hydro-power projects:
From the day you send the notification that you are seeking the CDM status to the day you are actually given the status, it takes in average 2 to 3 years (they would have to build the plants during this period). Then it can be at least another year before you receive the CERs. The price of 12 euro for a CER is for secondary market. The price for primary CER (directly sold by the producer) would be much less than 8 euro.

The figure of 20 000 CERs/year is completely unpredictable for the moment, here is a simplification of the calculation: One CER is equal to one tonne of CO2 equivalent that would be avoided by producing clean electricity. For example when you produce 1 MW electricity from coal, the process releases X tonnes of CO2 in the atmosphere but when you produce 1 MW from a hydropower plant, you do not release CO2. In order to calculate what the CDM project would be able to claim, we would have to know the CO2 emission factor of the North Korean grid and then multiply it by the amount of MWh produced by the CDM project. If most of the electricity produced these days in North Korea already comes from hydro-power plants, then the national emission factor will be low and the CDM project will not avoid a lot of CO2 emission (and so not earn a lot of €) Without the capacity of the future project and the national emission factor, it is impossible to estimate the amount of CERs the project could generate.

The CDM status seems quiet unrealistic to obtain for North Korean projects but other international agreements are discussed these days and their outcome may be more adapted.

ORIGINAL POST (2011-1-31): According to Radio Free Asia:

Nuclear-armed but cash-starved North Korea has expressed interest in joining the world carbon market in an apparent bid to earn precious hard currency and avoid international sanctions, an expert told RFA.

But the secretive Kim Jong Il regime has to disclose critical information, such as energy consumption data as well as methods by which it derives energy, to be eligible for funding under the United Nations’ Clean Development Mechanism (CDM), said the North Korea expert, speaking on condition of anonymity.

The CDM is aimed at encouraging companies or organizations in the developed world to invest in carbon dioxide emissions-saving projects in developing countries.

In return for funding and technology transfer, investors receive carbon credits, which can then either be traded on carbon markets or used to reduce their own emissions tally if they are subject to a domestic cap.

The Kyoto Protocol set emission caps for 38 countries through 2012, establishing the CDM as a worldwide carbon market. It is a cornerstone of the group’s efforts to tackle global warming.

The North Korea expert told RFA on Jan. 13 that Pyongyang intended to apply for funding via the CDM and that the regime might list its proposed hydro-electricity power projects under the U.N. mechanism.

UN refrains from comment

When contacted on the North Korea move, the U.N. Framework Convention on Climate Change (UNFCCC), the secretariat charged with implementing the global environmental treaty to stabilize greenhouse gas concentrations, said it would refrain from commenting on individual country projects.

The North Korea expert estimated that one ton of carbon dioxide would trade for about U.S. $26 dollars and if a hydro-electric power project was registered under the CDM, depending on the carbon credit bid price, about U.S. $1 million dollars could be earned annually.

A hydro project registered under the CDM would need to be evaluated by U.N. inspectors for it to qualify for carbon credits. Usually, it would be evaluated continuously for about 14 years.

Details, including the amount of energy linked to the hydro project and potential reduction of greenhouse gas emissions, would have to be submitted.

North Korea has been mostly reluctant to share information about its energy generation activities.

According to the expert, North Korea has recently displayed “great interest” in the possibility of operating hydro-electric power stations to alleviate its domestic energy shortages and to acquire “carbon credits” that it could, in turn, sell on the international carbon market.

Hard currency

As North Korea’s economic crisis worsens, Pyongyang is seeking ways to earn hard currency following a failed currency reform and due to sanctions imposed by the international community over its nuclear and missile developments and provocations targeting South Korea.

The interest in the CDM is likely to be part of this search.

The North Korea expert also said that earning hard currency through “carbon credits” would not be subject to sanctions imposed on Pyongyang under UN Security Council resolutions, and that any North Korea’s application for participation under the CDM “may stand a chance.”

“For North Korea, this could be an opportunity to earn hard currency without engaging in illegal armament sales, while operating an electric power station in transparent fashion, and accepting strict monitoring by the UN, and abiding by applicable international standards.”

The United States has been pressing China to use its influence to persuade North Korea regime to end recent provocations and return to disarmament talks involving the three countries and South Korea, Russia and Japan.

The six-party nuclear talks were last held in 2008. The impoverished North has been seeking a restart to the nuclear negotiations, which propose to reward its gradual nuclear disarmament with phased infusions of economic aid.

In a bid to renew dialogue and ease chances of conflict, South Korea recently proposed holding a preliminary meeting with North Korea on Feb. 11 to prepare for high-level defense talks. On Friday, the North suggested parliamentary talks between the two sides.

Read the full story here:
North Korea Eyes Carbon Market
Radio Free Asia
1/29/2011

Share

DPRK declares Huichon Power Stations operational

Friday, April 6th, 2012

 huichon-power-station-2012-3-19

Pictured above: Satellite images of the construction of the Huichon Power Station No. 2. Left: Bing (Date unknown). Right: Google Earth (2012-3-19)

UPDATE 2 (2012-10-11): The New Huichon Power Station providing electricity to Pyongyang (IFES):

Completed in April, Huichon Power Station is confirmed to be supplying electricity to the capital of Pyongyang. The No. 1 and No.2 hydro powerplants of Huichon are located on the upper reaches of Chongchon River with power generation capacity amounting to 300,000 kilowatts.

According to Choson Sinbo, Japan’s pro-North Korean news agency, Huichon Power Plant will be the main supplier of power to Pyongyang. Prior to its construction, Pyongyang Thermal Power Plant, East Pyongyang Thermal Power Plant, and Bukchang Thermal Power Plants provided electricity to the capital.

In the article, Kim, Myung-chul, DPRK official from the Ministry of Electric Power Industry stated, “Huichon Power Plant is helping the power supply of Pyongyang to a considerable extent. It is offering quality supply of electricity to the citizens.”

He also added, “In the past, power supply was unsatisfactory compared to the demand. Now, through a newly installed transmission lines, power can be supplied to the residents of Pyongyang with stable frequency and voltage.”

In recent years, the number of new apartments and other commercial and cultural facilities has drastically increased in Pyongyang and consequently, there is a growing demand for stable power supply. The news reported, ten additional small-to-medium power stations are expected to be constructed on the banks of Chongchon River.

Construction of Huichon Power Plant started in March 2009 as an initiative of Kim Jong Il, to solve the power shortage problem in Pyongyang. The plant originally began construction in 2001 but, Kim Jong Il pushed for swift completion by 2012, in time for the celebration of a strong and prosperous nation by 2012.

Kim Jong Il visited the construction site of Huichon over eight times from 2009 to 2011, and inspected Huichon as his first official activity of 2010, revealing the significance attached to the power plant.

North Koreans are branding the Huichon Power Station as a “monumental creation” and even included in the highly regarded, Arirang Mass Games program this year.

North Korea suffered from a widespread lack of electricity and has turned to hydoelectric power to supplement diminishing supplies of coal. The hydro powerplant of Huichon is expected not only solve the electricity shortage but also protect the farms and cities nearby from frequent flooding.

UPDATE 1 (2012-4-6): According to KCNA the plant is operational:

Huichon Power Station Goes Operational

Pyongyang, April 6 (KCNA) — The construction of the Huichon Power Station has been completed in the DPRK.

The completion makes it possible to more satisfactorily settle the shortage of electricity in Pyongyang, protect cultivated land and residential areas along the River Chongchon from flood and ensure an ample supply of industrial water to the industrial establishments in Huichon and Namhung areas.

The builders finished the construction of the power station in a matter of three years though it would have taken more than a decade at normal pace.

Inaugural ceremonies were held at Huichon Power Station Nos. 1 and 2 on Thursday.

Present there were Kim Yong Nam, Choe Yong Rim, Kim Yong Chun, Choe Thae Bok, Thae Jong Su and others.

A joint congratulatory message sent by the Central Committee and Central Military Commission of the Workers’ Party of Korea to the soldier-builders, members of the shock brigades, officials and helpers who distinguished themselves in the construction of the power station was conveyed there.

The message said that the builders, who devotedly carried out the behests of President Kim Il Sung and leader Kim Jong Il and demonstrated before the whole world that Korea does what it is determined to do, are true descendants of the President, soldiers and disciples faithful to Kim Jong Il and heroes of the times and patriots to be respected by the whole country.

The Party will always remember the heroic feats performed by the builders who erected a gigantic structure for the country’s prosperity and its people’s happiness, it noted.

It highly praised them for successfully building a giant power base in Huichon in a short span of time and thereby making a great contribution to settling the shortage of electricity in the country and instilling conviction of sure victory and hope into all people.

Choe Yong Rim, member of the Presidium of the Political Bureau of the WPK Central Committee and premier of the Cabinet, made addresses at the ceremonies.

He said that the Huichon Power Station is a monumental structure built in the Songun era thanks to the wise leadership provided by Kim Jong Il to build a thriving socialist nation on this land.

Referring to the achievements made in the construction, Choe noted these are the brilliant fruition of the wise guidance and meticulous care of Kim Jong Il and the dear respected Kim Jong Un who unrolled a grandiose plan for the building of the power station and energetically led the drive for its completion.

Speeches were made there.

The participants looked round Power Station Nos. 1 and 2.

The Daily NK reports the following:

Yesterday, Kim Young Nam, the head of the Standing Committee of the Supreme People’s Assembly, and Choi Yong Rim, North Korea’s Prime Minister, were among the regime elite figures present at a ceremony at Heechon Power Plant in Jagang Province.

Built to provide power to downtown Pyongyang, the hydroelectric facility is meant to be one of North Korea’s marquee engineering projects slated to go into operation in 2012, and as such was the site of four of Kim Jong Il’s trademark onsite guidance inspections in 2010 alone and five in total.

“Thanks to the struggle of construction workers including military personnel, the prospect of finishing this project before 2012 has opened up. Before the 100th anniversary of the birth of the Supreme Leader, the entire Party, military and the people should battle to get this power plant construction finished,” Kim reportedly said on his fourth such visit in December, 2010.

Designed to generate 300,000kw, the plant now becomes the largest of all North Korea’s ‘operational’ hydroelectric dams. According to the propaganda that accompanied the construction every step of the way, the electricity generated by Heechon is supposed to make big inroads into the country’s power generation shortfall.

However, according to one inside source, the determination to declare the project complete by April 2012 hides a less impressive reality. In truth, the electricity transmission facilities are apparently incomplete, while problems gathering enough water behind the dam mean that the production of electricity for civilian consumption is still some way off.

One inside source explained, “They already had a ceremony for Heechon last September, but electricity has still not been produced yet because of the transmission facilities. And even when that is finished, they cannot fill up the reservoir behind the dam so generation will still be very difficult.”

“Experts in North Korea say that getting enough water for the dam is harder than building the thing,” the source went on. “Gathering enough water to spin the turbines at Heechon looks like it will take a while.”

KCNA posted this video of the dams.

Here is coverage in NK Leadership Watch.

ORIGINAL POST (2012-1-23):  Huichon Power Station on Google Earth

The Huichon Power Stations 1 & 2 (희천1호발전소, 희천2호발전소) are too new to appear on Google Earth satellite imagery. I have, however, mapped them out by hand on the old imagery to give a better idea of their locations. I have also tagged them on Wikimapia.

In the picture above you can see that the Huichon Power Station’s headwaters begin in Ryongrim County (룡림군) where the newly-built Ryongrim Dam holds back a large reservoir. This reservoir drains through a tunnel [in orange in the image above] approximately 30 km long (18.5 miles) and empties through the Huichon Power Station No. 1 in Tongsin County into the Chongchon River. The river flows south where it crosses into Huichon County and builds up behind a second reservoir.  From this second reservoir the water drains out directly through the Huichon Power Station No. 2.

The construction of the Ryongrim Dam has resulted in the destruction of at least two villages, Toyang-ri (도양리) and Sinchang-ri (신창리).  Toyang-ri was destroyed for the dam itself. Sinchang-ri was flooded by the reservoir.  A third village, Kuryong-ri (구룡리), was also likely flooded or relocated—although this cannot be confirmed with current satellite imagery. The destroyed villages were probably relocated to Ryongrim Town itself. On several recent occasions North Korean television has highlighted improvements in housing and leisure facilities within the town.

 

When Kim Jong-il gave guidance visits to this site he often stood on the eastern side of the dam which offers the view captured in the image above (R).

The Huichon Power Station No. 1 itself is located in Tongsin County aproximately 30km due south from the Ryongrim Dam (40.273568°, 126.526565°).

 

In the satellite image above I have drawn the physical location of the power plant.  Next to and below it I have posted images from KCTV dated 2011-3-10.

The Huichon Power Station No. 2 lies on the Chongchon River just south of the border with Tongsin.

 

This project might have resulted in the destruction of one village, Kyonghung-ri (경흥리), in Tongsin County, but this is impossible to confirm without better satellite imagery.

So where will the electricity produced at these new power stations be consumed? On January 21, 2012, Rodong Sinmun reported the answer:

Like the warm hands of leader Kim Jong Il, the transmission lines from the Huichon Power Station are now almost stretching out for the capital city of Pyongyang.

To meet the great expectations of Kim Jong Il who entrusted them to such a gigantic work, the builders of the power station have gained great successes.

They have erected big dams, cut waterway tunnels and carried out other bulky tasks that were said to take ten years and more; and in the wake of trial operation of generating equipment at the Huichon Power Station No. 1, they successfully assembled the hulks of generators at the Huichon Power Station No. 2.

These successes had an immediate chain reaction on the scaffold workers laying transmission cables from the power station to the capital city.

They have already laid transmission cables in scores of kilometer long section, while preceding the construction of pylons in two months.

By their heroic labor, the excavation work to lay the foundation for the pylons have been wound up, too.

Now, their job is concrete tamping of the pylons’ foundations. By introducing new work methods they are hastening their work of erecting pylons as firm as would stand for many hundred years.

Now that power lines have been lain in major sections, they have buckled down to laying the power lines in the remaining sections and erecting transformer substations to reach the capital city as early as possible.

It won’t be long before we can see the power lines reach Pyongyang amid the cheers of the citizens.

Since I have mapped out a significant portion of the North Korean electricity grid on Google Earth, I can point out an area where I believe these power cables are being constructed. In the image below, dated 2010-9-14, I have connected the power cable tower construction sites with a yellow line:

In the image above there are approximately 146 power cable towers under construction between Pakchon (North Pyongan-top of image) and Sunan (Pyongyang-bottom of image). Of course, to be certain that these are the specific lines connecting Huichon and Pyongyang,  I will need more imagery.

Share

Kim Jong-un makes over 61 onsite inspection visits

Tuesday, February 7th, 2012

Institute for Far Eastern Studies (IFES)
2012-2-1

Since Kim Jong-un’s first election as the vice-chairman of the Korean Workers’ Party Central Military Commission (CMC) on September 28, 2010, Kim Jong-un was reported to have made 33 accompanied onsite inspections with Kim Jong-il and a total of 61 visits at industrial sites.

Out of the 61 total visits, Kim Jong-un inspected the following industries: power/electricity (5 times); metal (3 times), machinery (12 times); agricultural (4 times); light (5 times); food (14 times); and industrial (4 times). Construction sites of Huichon Power Stations were visited four times while the Huichon Ryonha General Machinery Plant and the Kanggye General Tractor Plant were also visited multiple times.

Kim Jong-un’s “economic learning” began while accompanying his late father Kim Jong-il on onsite inspections. Even when Kim Jong-il was alive, Kim Jong-un was most likely to have made preliminary visits to these industrial sites for a closer assessment as a part of his duty as the vice-chairman of the CMC.

The significance of the recent visits mainly lie with inspections to the Huichon Power Stations (located in Jagang Province) equipped with 300,000 kW of power generation capacity. Huichon Power Station was an important national strategic project which was often emphasized by Kim Jong-il, “The construction of the power plant must be completed before the centennial birthday of the Great Leader (Kim Il-sung) with great efforts from the entire party, military and the people.”

The electricity produced at the Huichon Power Station is likely to be distributed primarily in the Pyongyang area around the two national holidays, the Day of the Shining Star (Kim Jong-il’s birthday) and the Day of the Sun (Kim Il-sung’s birthday). Currently, power line constructions are still underway in Pyongyang.

At Huichon, constructions of additional terraced power plants are under planning using the currents from the Yangtze and Cheongcheo Rivers. The electricity produced from these plants is likely to be distributed to the industrial areas in Jagang Province, which is central to the machinery and national defense industries.

Important policy implications can be found from Kim Jong-un’s past accompaniment to the Huichon Ryonha General Machinery Plant with Kim Jong-il. This plant is currently emphasized as Kim Jong-un’s accomplishment and revered as, “the industrial revolution of the new era,” and a “site of CNC (Computer Numerical Control) breakthrough.” In addition, Kim Jong-un’s economic leadership is acclaimed for placing prominence on the state-of-the-art technology and “knowledge-based economy.”

Kim Jong-il visited the Huichon Ryonha General Machinery Plant on October 28, 2011 with Kim Jong-un and inspected the CNC assembly line, CNC processing plant, and CNC machineries. He stressed, “Modernization must be promoted in all sectors and levels founded on the state-of-the-art technology. The achievements in the CNC technology should serve as the stepping stone to move forward toward a higher level of science and technology.”

Similarly on October 27, 2011, Kim Jong-il visited the Yangtze River Machinery Plant* with the younger Kim and stressed, “Powerful economic nation that we are seeking is knowledge-based economy which is only possible when CNC technology and automation is realized that can create material wealth through little resources, efforts, and energy.”

The “knowledge-based economy” will likely become the trademark of Kim Jong-un and esteemed as following the “teachings of Kim Jong-il.” Kim Jong-un’s recent industrial site visits were concentrated on the cutting edge production facilities equipped with modernized and automated production processes.

* NKeconWatch: I believe this name is an error and the correct location is the Jangjagang Machine Plant.

Share

KCNA: 20-day industrial output value increases over Jan 2011

Friday, January 27th, 2012

According to KCNA (2012-1-25):

The gross industrial output value grew 1.2 times for twenty days of January this year as against the same period last year.

This is the result of the high-pitched drive waged by all the workers of the country since the first day of this year after receiving with excitement the joint calls of the Central Committee and the Central Military Commission of the Workers’ Party of Korea, the joint New Year editorial for this year and the letter of the working people in South Hamgyong Province.

In the period, the Ministry of Light Industry increased the production 1.4 times and the Ministry of Food and Daily Necessities sharply boosted the production.

Thermal and hydropower stations have increased the ratio of operating the generating equipment.

Much effort is being concentrated on supplying coal to the thermal power plants and chemical and metal plants and developing more coal beds.

The Ministry of Coal Industry produced 12,000 more tons of coal than planned for the 20 days.

Iron mills and steelworks also increased the production.

The freight transport volume increased by 12 percent from the same period last year.

Innovations were made in the production of vinalon and fertilizer by the industrial establishments in the field of chemical industry and in the production of custom built equipment and mining machines by the industrial enterprises of the field of machine industry.

The forestry stations and pit wood stations increased the timber production.

Progress has been reported on a daily basis from the important projects including the building of apartments in Mansudae areas and the Paektusan Songun Youth Power Station.

For the uninitiated, this is about as close as the DPRK gets to releasing economic statistics. Note there are no base numbers–only [some] % increases. Also, despite the measure being officially named “output value”, it is really just a claim of increased physical production.  There is no value (prices) or mention of “services” included in these measures.

Unfortunately without more solid numbers, and the proclivity to ascribe productivity gains to effective propaganda, these reports cannot be taken seriously.

Although we all talk about the DPRK’s GDP and per capita income as if the numbers are solid, the reality is quite the opposite.  In addition to the general lack of information, there are all sorts of methodological problems with assessing the value of the DPRK’s economy.  Here are some helpful sources if you want to learn more:

1. DPRK Economic Statistics Report

2. G. Warren Nutter papers:

– (JSTOR) “Soviet Industrial Growth”, Source: Science, New Series, Vol. 130, No. 3370 (Jul. 31, 1959), pp. 252-255

-(JSTOR) “Industrial Growth in the Soviet Union”, The American Economic Review , Vol. 48, No. 2, Papers and Proceedings of the Seventieth Annual Meeting of the American Economic Association (May, 1958), pp. 398-411

-(JSTOR) Some Observations on Soviet Industrial Growth”, The American Economic Review , Vol. 47, No. 2, Papers and Proceedings of the Sixty-eighth Annual Meeting of the American Economic Association (May, 1957), pp. 618-630

3. The North Korean Economy by Nicholas Eberstadt

4. Assessing the economic performance of North Korea, 1954–1989: Estimates and growth accounting analysis

5. Bank of Korea’s assessment fo the DPRK economy in 2010.

6. My North Korean Economic Statistics Page

Share

An update on the Huichon and Ryesonggang Power Stations

Monday, January 23rd, 2012

Huichon Power Station on Google Earth
The Huichon Power Stations 1 & 2 (희천1호발전소, 희천2호발전소) are too new to appear on Google Earth satellite imagery. I have, however, mapped them out by hand on the old imagery to give a better idea of their locations. I have also tagged them on Wikimapia.

In the picture above you can see that the Huichon Power Station’s headwaters begin in Ryongrim County (룡림군) where the newly-built Ryongrim Dam holds back a large reservoir. This reservoir drains through a tunnel [in orange in the image above] approximately 30 km long (18.5 miles) and empties through the Huichon Power Station No. 1 in Tongsin County into the Chongchon River. The river flows south where it crosses into Huichon County and builds up behind a second reservoir.  From this second reservoir the water drains out directly through the Huichon Power Station No. 2.

The construction of the Ryongrim Dam has resulted in the destruction of at least two villages, Toyang-ri (도양리) and Sinchang-ri (신창리).  Toyang-ri was destroyed for the dam itself. Sinchang-ri was flooded by the reservoir.  A third village, Kuryong-ri (구룡리), was also likely flooded or relocated—although this cannot be confirmed with current satellite imagery. The destroyed villages were probably relocated to Ryongrim Town itself. On several recent occasions North Korean television has highlighted improvements in housing and leisure facilities within the town.

 

When Kim Jong-il gave guidance visits to this site he often stood on the eastern side of the dam which offers the view captured in the image above (R).

The Huichon Power Station No. 1 itself is located in Tongsin County aproximately 30km due south from the Ryongrim Dam (40.273568°, 126.526565°).

 

In the satellite image above I have drawn the physical location of the power plant.  Next to and below it I have posted images from KCTV dated 2011-3-10.

The Huichon Power Station No. 2 lies on the Chongchon River just south of the border with Tongsin.

 

This project might have resulted in the destruction of one village, Kyonghung-ri (경흥리), in Tongsin County, but this is impossible to confirm without better satellite imagery.

So where will the electricity produced at these new power stations be consumed? On January 21, 2012, Rodong Sinmun reported the answer:

Like the warm hands of leader Kim Jong Il, the transmission lines from the Huichon Power Station are now almost stretching out for the capital city of Pyongyang.

To meet the great expectations of Kim Jong Il who entrusted them to such a gigantic work, the builders of the power station have gained great successes.

They have erected big dams, cut waterway tunnels and carried out other bulky tasks that were said to take ten years and more; and in the wake of trial operation of generating equipment at the Huichon Power Station No. 1, they successfully assembled the hulks of generators at the Huichon Power Station No. 2.

These successes had an immediate chain reaction on the scaffold workers laying transmission cables from the power station to the capital city.

They have already laid transmission cables in scores of kilometer long section, while preceding the construction of pylons in two months.

By their heroic labor, the excavation work to lay the foundation for the pylons have been wound up, too.

Now, their job is concrete tamping of the pylons’ foundations. By introducing new work methods they are hastening their work of erecting pylons as firm as would stand for many hundred years.

Now that power lines have been lain in major sections, they have buckled down to laying the power lines in the remaining sections and erecting transformer substations to reach the capital city as early as possible.

It won’t be long before we can see the power lines reach Pyongyang amid the cheers of the citizens.

Since I have mapped out a significant portion of the North Korean electricity grid on Google Earth, I can point out an area where I believe these power cables are being constructed. In the image below, dated 2010-9-14, I have connected the power cable tower construction sites with a yellow line:

In the image above there are approximately 146 power cable towers under construction between Pakchon (North Pyongan-top of image) and Sunan (Pyongyang-bottom of image). Of course, to be certain that these are the specific lines connecting Huichon and Pyongyang,  I will need more imagery.

 More on the Huichon Power Stations here.

Ryesonggang Power Station 2 update

I previously wrote about the Ryesonggang Power Station No. 2 here. Since a newer satellite image has come to my attention that shows the project completed, however, I thought I would post an update.

 

 

 

Ryesonggang Power Station No. 3 

On June 25, 2011 North Korean television showed construction of the Ryesonggang Power Station No. 3 had begun.  The DPRK submitted this project to the UNFCC’s Carbon trading program. Using satellite imagery, we can see that construction is indeed well under way:

 

The satellite images above are dated 2007-10-4 (L) and 2011-3-23 (R). In the right-hand photo I have boxed in the construction site and the quarters and facilities of the construction workers.

UPDATE: This was picked up by Radio Free Asia.

 

Share

DPRK electricity grid

Friday, September 23rd, 2011

UPDATE: On a flight today I was able to translate most of this map.  Interestingly, it shows the incomplete Kumho Light Water Reactor (금호원자력발전소: in yellow on the right) but none of the other nuclear facilities.

ORIGINAL POST: A recent visitor to the DPRK took this picture of a map of the North Korean electricity grid:

See larger version here

This is one of the best maps of the North Korean electricity grid that I have seen (abstract as it is). This will be immensely helpful for my own efforts to map the North Korean electricity grid on Google Earth:

Share

The Environmental Protection Law amended — environmental certification system to be newly introduced

Thursday, September 1st, 2011

Institute for Far Eastern Studies (IFES)
2011-8-31

According to the KCNA, North Korea amended its environmental protection law on August 18, adding development of energy and environmental certification system into the revised act.

The environmental protection law is comprised of four sections and 50 articles, in which articles 38, 39, and 40 were added recently. These contain laws related to the development and usage of renewable energy resources, recycling technology, and implementation of environmental certification system. In addition, articles 44 and 48 were also supplemented in Section 4. They include plans for setting up environmental economic indicators.

According to the KCNA, “Based on this law, each agencies, companies and organizations are reducing fossil energy consumption to protect the environment and promote continuous economic growth. In its place, renewable energy resources such as solar, wind and geothermal energy are currently being explored.”

North Korea has registered eight hydroelectric plants with the UNFCCC (United Nations Framework Convention on Climate Change) to receive carbon credits which can be sold to earn hard currency. Receiving accreditation toward the CDM (Clean Development Mechanism) will allow developing countries to earn tradable carbon credits for emissions reductions from clean-energy projects.

Currently, Ryesonggang Hydropower Plant No. 3, 4, 5 and Wonsangunmin Hydropower Plant No. 1 reached the validation phase while the other four plants are at the prior consideration phase.

On July 26, the KCNA explained the environmental protection law was revised “to beautify our homeland, protect the health and wellbeing of our people, and provide culturally hygienic environment with favorable working conditions.” Accordingly, the environmental protection law passed in 1999 is now ineffective.

In recent years, North Korea seems to be paying keen attention to environmental protection issues. From May 16 to June 10, ten senior officials from the DPRK Ministry of Land and Environmental Protection and National Science and Technology Commission were invited to a training course at the Asian Institute of Technology in Thailand.

The program was implemented by the United Nations Economicand Social Commission for Asiaand the Pacific (ESCAP) as a part of the project “Promoting Regional and Economic Cooperation in Northeast Asia.” The four-week training program provided highly specialized training on integrated watershed management and reforestation.

Additional Information: You can read more about the DPRK’s CDM efforts here, here, and here.

Share

Roundup of Kim Jong-il’s 2011 trip to Russia (and China)

Wednesday, August 31st, 2011

UPDATE 12 (2011-8-31): The North Koreans have made a short documentary of Kim Jong-il’s trip to Russia.  I have uploaded it to YouTube in three parts: Part 1, Part 2, Part 3.  The North Koreans published footage of Kim’s trip through China on the evening news (2011-8-30: Part 1, part 2, part 3) and in a separate documentary (2011-9-8: Part 1, part 2, part 3).

UPDATE 11 (2011-8-29): When Kim Jong-il returned to Pyongyang his trip was hailed as a success. A banquet was held for him and he attended a performance of the State Merited Chorus.  According to Yonhap:

North Korean leader Kim Jong-il attended a banquet held to congratulate him on his “successful” recent visits to Russia and China, the North’s state media said Monday.

The banquet was hosted by the Central Military Commission of the ruling Workers’ Party and the National Defense Commission, according to a brief dispatch by the Korean Central News Agency (KCNA), monitored in Seoul. It did not mention where or when the event took place.

KCNA has a little more on the banquet here and the chorus here.

Afterwards, Kim Jong-il returned to his never-ending work for the people. Just as he did following his previous trip to China, Kim visited the construction site of the Huichon Power Station.

UPDATE 10 (2011-8-27): According to Yonhap, Kim Jong-il’s train has crossed back into the DPRK.  Given the information provided, it appears that Kim entered the DPRK via the railroad crossing at Manpo (Manpho, 만포).  See the bridge in Google Maps here. According to Yonhap:

North Korean leader Kim Jong-il returned home by train Saturday, wrapping up a week-long trip to Russia and China, during which he discussed the resumption of stalled six-party talks on his country’s nuclear ambitions.

Kim’s special train was seen crossing into North Korea via the Chinese border city of Jian around 5 p.m. local time (6 p.m. Korean time). The train had left the northeastern Chinese city of Daqing on Friday evening and made a stop in the city of Tonghua on Saturday morning.

According to KCNA, Kim Jong-un and Kim Kyong-hui were there to welcome him.  Kim Jong-un played the same role on Kim’s previous trip to China in May.

UPDATE 9 (2011-8-26): While Kim travels in Russia and China, Yonhap reports a KCNA announcement that the DPRK and Russia signed a protocol calling for economic cooperation between the two countries.  According to the article:

A Russian economic delegation, led by Minister of Regional Development Viktor Basargin, was in North Korea to sign “a protocol of the 5th Meeting of the DPRK (North Korea)-Russia Intergovernmental Committee for Cooperation in Trade, Economy, Science and Technology,” the North’s Korean Central News Agency (KCNA) said.

Trade Minister Ri Ryong-nam inked the protocol on behalf of North Korea, said the KCNA report, monitored in Seoul.

The report did not give any details of the protocol.

Also on Friday, the North’s premier, Choe Yong-rim, met with the Russian economic delegation at the Mansudae Assembly Hall in Pyongyang, the KCNA said in a separate report.

UPDATE 8 (2011-8-26): Xinhua reports on Kim’s activities in China. According to the article:

Top leader of the Democratic People’s Republic of Korea (DPRK) Kim Jong Il visited northeast China’s Heilongjiang Province on Friday at the company of Chinese State Councilor Dai Bingguo.

During his stay in Heilongjiang, Kim visited the cities of Qiqihar and Daqing. In Qiqihar, Kim toured Qier Machine Tool Group Co., a large state-owned enterprise, and Mengniu Dairy, a leading Chinese dairy producer. In Daqing, he toured an urban planning exhibition hall and a residential district.

“I’ve seen new changes every time I came here,” he said. He wished that China would smoothly realize the goals set in its 12th Five-year Plan under the leadership of the CPC.

KCNA has a rather long (erm…detailed) update on Kim’s visit to China. Here is the report for August 25th:

He passed through the Inner Mongolian Autonomous Region of China on August 25.

He arrived in Manzhouli of the region, the border railway station, that afternoon.

When the train pulled in the railway station, he was warmly greeted by Wang Jiarui, Sheng Guangzu, Hu Chunhua, secretary of the Inner Mongolian Autonomous Regional Party Committee, Fu Taizeng, secretary general of the autonomous regional party committee, Luo Zhihu, secretary of the Hulun Buir City Party Committee, the mayor of Hulun Buir City, the secretary of the Manzhouli City Party Committee and other central and regional senior officials of China.

He exchanged cordial greetings with the senior officials present to greet him and had a talk with them.

Wang Jiarui said he was specially dispatched to conduct Kim Jong Il who is passing through Northeast China in the whole period of his visit upon the authorization of the collective leadership of China including Hu Jintao. He paid highest tribute to Kim Jong Il for having made a great contribution to boosting the friendship among countries and accomplishing the human cause of independence through his energetic external activities.

Kim Jong Il thanked Wang Jiarui and other senior central and local officials and people for their warm reception.

He, conducted by senior party and government officials of the autonomous region, toured Hailar District, Hulun Buir City of the region.

Commanding a bird’s-eye view of the night scenery, he got familiar with the history and culture of the region and the achievements made by its people in construction.

The Inner Mongolian Autonomous Regional Committee of the CPC gave a grand banquet in honor of Kim Jong Il visiting the region.

When he appeared in the banquet hall, women of the Mongolian tribe of the autonomous region presented him with a blue silk towel and liquor according to the customs peculiar to the nation, warmly welcoming him.

Hu Chunhua said that today they welcomed Kim Jong Il to the vast steppe where President Kim Il Sung was accorded enthusiastic welcome several times long ago, thereby seeing the desire of the party, the government and the people of the autonomous region come true at last.

Hu Chunhua noted that the traditional Sino-DPRK friendship will remain ever-green like the vast steppe along with history, expressing firm belief that the friendly Korean people would make fresh success in the efforts to improve the standard of people’s living and build a prosperous and powerful nation.

A specially prepared art performance was given in honor of Kim Jong Il.

The performers clearly reflected the boundless respect and reverence of the government and the people of the region for Kim Jong Il visiting China again for the development of the Sino-DPRK friendship.

Kim Jong Il conveyed a floral basket to the performers in congratulation of their successful performance and had a photo taken with them.

He was presented with a gift by Hu Chunhua on behalf of the party committee of the autonomous region.

He expressed thanks for the warm reception and cordial hospitality accorded him by the party, government and people of the Inner Mongolian Autonomous Region. He hoped the people of the region would achieve a fresh victory in their struggle for the prosperity and development of the country under the leadership of the CPC.

Here is the KCNA report for August 26th:

Kim Jong Il passed through Heilongjiang Province of China on August 26.

He arrived in Qiqihar City, Heilongjiang Province that morning.

When the train pulled in Qiqihar Railway Station, he was warmly greeted by Ji Bingxuan, secretary of the Heilongjiang Provincial Party Committee, Wang Xiankui, governor of Heilongjiang Province, the secretary of the Qiqihar City Party Committee, the mayor of Qiqihar City and other senior party and government officials of the province and the city.

He exchanged warm greetings with the senior officials present to greet him and had a talk with them.

Ji Bingxuan said it is great honor and pride to welcome again to their place Kim Jong Il on a long foreign tour for friendship among countries and warmly welcomed him on behalf of the party, the government and the people of Heilongjiang Province.

Kim Jong Il visited the Qiqihar Machine Tool Group Co. No. 2 that day.

After being briefed on its history by a senior official of the group, he went round several production processes to acquaint himself with its production, technological development and management in detail.

Then he visited the Qiqihar Branch Company of the Mengniu Dairy.

He went round the general control room, milk tank, packing shop and the products on display and wished the company greater progress in its work for the improvement of the standard of people’s diet and welfare.

Kim Jong Il also visited Daqing City that day.

He visited the urban planning exhibition hall in Daqing City and was briefed on the urban construction and long-term plan. Then he went round the housing construction district, a large bridge, Lake Liming Bridge now under construction and other places in the province.

The provincial party committee gave a banquet that evening in honor of Kim Jong Il visiting the province.

He was present at the banquet on invitation.

Ji Bingxuan said that the historic visit paid by Kim Jong Il to Heilongjiang Province again after the lapse of the three months is a striking demonstration of the Sino-DPRK friendship growing stronger day by day, adding that the provincial party, government and people would join the Korean people in playing a greater role in inheriting and developing the Sino-DPRK friendship generation after generation.

A special art performance was given in welcome of Kim Jong Il.

The performers successfully represented the excitement and joy of the Chinese people at welcoming again Kim Jong Il to meaningful Northeast China.

Kim Jong Il conveyed a floral basket to the artistes in congratulation of their successful performance.

He was presented with a gift by the provincial party and people’s government that day in welcome of him visiting the province.

He expressed thanks for the warm reception and cordial hospitality accorded to him by the party, government and people of Heilongjiang Province. He hoped the people of the province would achieve a fresh victory in their struggle for the prosperity and development of the country under the leadership of the CPC.

Here is the KCNA report for August 27th:

He arrived in Tonghua City, Jilin Province that morning.

When the train pulled in Tonghua Railway Station, he was warmly greeted by Sun Zhengcai, secretary of the Jilin Provincial Party Committee, Wang Rulin, governor of Jilin Province, Liu Baowei, secretary of the Tonghua City Party Committee, Tian Yulin, mayor of Tonghua City, and other senior party and government officials of the province and the city.

He exchanged warm greetings with the officials present there to receive him and visited the Tonghua Wine Co. Ltd., conducted by them.

He recollected with deep emotion the noble footprints left by President Kim Il Sung who was absorbed in thinking and made inquiry for the sake of the country and its people only when visiting the company nearly half a century ago.

He went round various places including the wine depot, its exhibition hall to learn in detail about the history of the company and its production system, storage of products and its taste. He wished the company greater progress in its work for the well-being of the people.

The party and government of the province hosted a grand banquet in honor of Kim Jong Il visiting the province.

He was present there on invitation.

Sun Zhengcai said that it was particular privilege and honor for his province to receive Kim Jong Il, the great leader of the Korean people, three times in a little more than one year. He offered the highest regard and warm welcome to Kim Jong Il on behalf of the party, government and people of the province.

Noting that all the Chinese people including the people of the province are rejoiced as over their own over the successes made by the Korean people recently in their efforts to significantly commemorate the centenary of birth of Kim Il Sung, Sun Zhengcai expressed expectation and belief that the Korean people would surely win a shining victory in the drive for building a prosperous and powerful socialist nation under the leadership of the Workers’ Party of Korea headed by Kim Jong Il.

Sun noted that the party, government and people of the province would join the Korean people in playing a bigger role in inheriting and developing the Sino-DPRK friendship generation after generation.

An art performance was given in welcome of Kim Jong Il.

The performance replete with the warm feelings of the DPRK-China friendship was acclaimed by the audience.

He was presented with a gift by the provincial party and people’s government that day in welcome of his visit to the province.

He expressed thanks for the warm reception and cordial hospitality accorded to him by the party, government and people of Jilin Province. He wished them a fresh success in their efforts for the prosperity of the country and the well-being of its people under the leadership of the CPC.

He wrapped up his 8 000 km odd-long trip to the Far East and the Siberian regions of Russia and Northeast China and left for the homeland that day.

Before his departure, he exchanged warm farewell greetings with central leading officials including Wang Jiarui and Sheng Guangzu who conducted him with sincerity in the whole period of his visit and leading officials of the party and government of the province and the city including Sun Zhengcai and Wang Rulin.

When the train started from the border station, central and local leading officials of China warmly sent him off, waving their hands for a long while.

Passing through several cities and regions of China, he acquainted himself with construction projects, ideas and feelings, politics, economy, history, culture, etc. of the Chinese people more deeply and conducted unremitting and energetic external activities, making another great contribution to the development of the DPRK-China friendship.

UPDATE 7 (2011-8-25/26): According to Voice of America, Kim Jong-il has left Russia and is returning to the DPRK via China.  His train crossed the Russia-China border at Zabaikalsk (Забайкальск, See in Google Maps here). Yonhap reports that on the Chinese side of the border Kim’s Train was greeted in Manzhouli by senior Chinese Communist Party envoy Wang Jiarui and other officials. Kim attended a banquet and arts performance before heading to nearby Hulunbeier (See in Google Maps here).

UPDATE 6 (2011-8-24): Kim Jong-il meets with Medvedev at Sosnovyy Bor east of Ulan-Ude (Сосновый бор, See in Google Maps here). The topics discussed are linked below:

According to the Los Angeles Times:

Medvedev ordered a commission to evaluate the parameters of laying a gas pipe through North Korea, according to the president’s statement posted on the Kremlin website. The pipe would stretch for more than 1,100 km, 700 of which would run through North Korea and would pump 10 billion cubic meters of gas annually.

The two leaders also discussed a plan for Russia to extend power lines into North Korea to sell electricity from facilities like the Bureya hydroelectric plant. Before arriving to meet Medvedev, Kim visited the Bureya plant, where he swam in a pool filled with water from Lake Baikal. Afterward, the North Korean strongman was treated to such local cuisine as meat dumplings and fish prepared over an open fire, press reports said.

Accoridng to UPI:

North Korea is willing to return to the six-party talks and to consider a moratorium on nuclear testing, Russian President Dmitry Medvedev said Wednesday.

Medvedev and North Korean leader Kim Jong Il met in Sosnovy Bor, a garrison town in the Russian Republic of Buryatia in South Siberia, RIA Novosti reported.

Natalia Timakova, a spokeswoman for Medvedev, said Kim was prepared to resume nuclear talks without any preconditions. The talks were suspended two years ago, and Russia and China have said they are prepared to return to the table immediately while the United States, Japan and South Korea want North Korea to show good faith first.

Kim also agreed to allow Gazprom, the state-owned Russian natural gas company, to build a pipeline to South Korea through his country. The two leaders also discussed North Korea’s outstanding debt to the former Soviet Union and possible food aid from Russia.

RIA Novosti said some reports estimate the project could bring about $100 million a year in much-needed hard currency to Pyongyang.

“We’ve ordered our government bodies to establish a special commission … to outline the details of bilateral cooperation on gas transit through the territory of North Korea and the joining of South Korea to the project,” Medvedev was quoted as saying.

The Russian leader said technical work on the pipeline would start soon.

South Korea is one of the largest buyers of natural gas, with imports of liquefied natural gas from Russia alone totaling 1.5 million tons last year, South Korea’s Yonhap news agency reported. The report said North Korea reacted favorably to the project during the visit of Gazprom officials.

Accoridng to Bloomberg:

North Korea owes Russia $11 billion of debt that dates back to the Soviet period and the two countries have resumed talks to restructure the Asian state’s liabilities, Deputy Finance Minister Sergei Storchak said.

Russia hasn’t lent money to North Korea since the collapse of the Soviet Union in 1991 because the communist state hasn’t settled its debt, Storchak told reporters at a military base near Ulan-Ude, a Siberian city close to the border with Mongolia. North Korea also has yet to recognize Russia as the successor to the Soviet Union, he said.

Russian President Dmitry Medvedev agreed on a joint approach to debt restructuring with North Korean leader Kim Jong Il at their meeting near Ulan-Ude today, said a Kremlin official, who declined to be identified in line with government policy. Russia and North Korea restarted talks on the issue a month and a half ago after a long pause, the official said.

The resumption of negotiations is seen as a breakthrough by the Russian delegation attending today’s meeting, according to the official.

According to RIA Novosti, the DPRK is interested in renting farm land in Eastern Siberia.

According to UPI, the Russians and the DPRK plan to increase naval cooperation.

According to the Choson Ilbo, the North Koreans might have been interested in acquiring Russian aircraft.

 

Andrei Lankov is skeptical any of the economic projects will become operational.

Aidan Foster-Carter believes the pipeline will be built.

UPDATE 5 (2011-8-22): Kim arrives in Ulan-Ude (Улан-Удэ), and tours Lake Baikal and an aircraft factory. See the Ulan-Ude train station in Google Maps here. See Lake Baikal on Google Maps here. See the Ulan-Ude Aviation Plant in Google Maps here. According to a video later released by the DPRK, Kim Jong-il also visited the Lenin-head statue at the seat Ulan Ude’s government (See in Google Maps here) and the “Mega Titan” super market (мега титан, See in Google Maps here).  Though the visit to the aircraft factory is never mentioned in KCTV coverage of the visit, the Choson Ilbo reports that the DPRK’s air force chief, Gen. Ri Pyong-chol (리병철), was also on the trip–leading to speculation that the DPRK air force was shopping for new aircraft.

According to the AP:

Kim took a two-hour Baikal tour on a yacht guarded by two North Korean boats, the Inform Polis Online website reported quoting eye-witness accounts. The water in Baikal is ice-cold even in summertime, so Kim had to take a swim onshore — in a pool filled with Baikal water. The speaker of Buryatia’s legislature joined Kim in the swim, the news website reported.

On the shore, the North Korean leader was treated to traditional Buryat food including meat dumplings and Baikal fish prepared over an open fire.

Later on Tuesday, Kim went back to Ulan-Ude to visit a major aircraft factory, which among other things produces Sukhoi attack planes, the ITAR-Tass news agency reported from the plant.

The North Korean leader’s visit is shrouded in mystery. A few people managed to take photos of Kim at his previous stop on Sunday, but heavy police cordons kept the media and onlookers in Ulan-Ude away from the train station and the adjacent square.

Anna Ogorodnik, a photographer from Ulan-Ude, told the Associated Press by phone that nearby streets were full of riot police. The station square looked clean and deserted after authorities had tugged away cars and local buses.

The windows of the station building overlooking the tracks were plastered with sheets of paper and station employees had been ordered to stay indoors, Ogorodnik said.

The photographer said she had been detained after trying to take pictures. She was released after she had presented her journalist ID.

The station square remains cordoned off and Kim’s train is still at the station, Ogorodnik said.

It is Kim’s first visit to his country’s Cold War ally in nine years.

Russian military officials arrived in the North Korean capital on Monday for a five-day visit. The Russian Defense Ministry said the talks will focus on the renewal of military cooperation between the countries, possible joint exercises “of a humanitarian nature” and an exchange of friendly visits by Russian and North Korean ships, ITAR-Tass reported from Pyongyang.

UPDATE 4 (2011-8-23): Writing in the Asia Times, Sunny Lee offers some political context of the trip as well as offering an estimated sum the DPRK can expect to earn if it agrees to the pipeline deal:

Cash-strapped North Korea, committed to staging a great national display of prosperity next year to mark the 100th anniversary of Kim Il-sung’s birthday, is likely to welcome any such deal. If realized, it could expect to earn more than US$500 million a year in handling charges over the gas pipeline alone. Russia is also interested in linking the Trans-Siberian Railways to both Koreas, with the aim of reviving the Far Eastern region’s economy.

The Daily NK puts that number signficantly lower:

For North Korea, the gas pipeline could provide a stable income of approximately $100 million-$150 million. Compared to the Kaesong Industrial Complex, which requires more than 47,000 workers and earns North Korea just $50 million, it is a very attractive figure.

UPDATE 3 (2011-8-21): Kim Jong-il arrives in Russia’s Amur region (Bureya, Бурея) on Sunday August 21 and tours Bureiskaya Power Station. See the Bureya Train Station in Google Maps here. See the Bureiskaya Power Station in Google Maps here.  According to the AFP:

North Korea’s reclusive leader Kim Jong Il and his wife received a red carpet welcome Sunday in Russia’s Amur region where they toured a giant power station ahead of talks with President Dmitry Medvedev.

It was the second day of Kim’s week-long visit to the Russian Far East and Siberia, a rare trip out of his country battling isolation and hunger.

Earlier on Sunday his special armoured train arrived at the small Bureya station in the Amur region and smiling Russian women dressed in red national costumes offered the high-profile guest a loaf of bread and salt, in accordance with Russian tradition.

The 69-year-old leader looked serious and slightly tired as flag-waving locals greeted him at the station.

Sporting sunglasses and his trademark khaki-coloured military-style suit, Kim broke off a piece of bread as the Kremlin’s regional envoy Viktor Ishayev and a throng of local officials looked on.

“He is rather simple, seems to be a genial man,” gushed a young Russian woman in the national dress, speaking later in televised remarks.

After the short welcome ceremony Kim got into an armoured Mercedes, which he brought with him on the train, to visit a nearby hydro-power station.

He appeared to take a keen interest in the 2,000 megawatt-strong Bureiskaya power station as Ishayev and the local governor gave him a tour of the plant.

South Korea’s Yonhap news agency, citing pictures taken at the plant, said 47-year-old Kim Ok — a former secretary known as Kim’s fourth wife — was accompanying the leader on the journey.

At the power station — the largest in Russia’s Far East — Kim was treated to a spectacular show of the water being discharged into the river, a local law enforcement official said.

He watched the water release from the safety of a white tent pitched at the station, next to a table with snacks, pies and a watermelon, and was also shown a film about the plant translated into Korean, the official said.

“Inexhaustible is the strength of the Russian people who occupied Bureya nature,” the official Korean Central News Agency quoted Kim as saying in the visitor’s book.

A Russian official familiar with the matter told AFP Kim had planned to visit the station earlier in the summer when he had been expected to hold a bilateral summit with Medvedev in or near Vladivostok.

A Kremlin official was quoted as saying at that time that Kim had cancelled due to media leaks about the visit.

Yelena Vishnyakova, a spokeswoman for state-run RusHydro which operates the power plant, said her company was not currently holding any talks with North Korea about any possible construction of power stations.

While Kim toured the power station, his entourage cleaned and polished his armoured train parked at Bureya, a tiny economically depressed town near the city of Blagoveshchensk on Russia’s eastern fringes.

After returning from the station he continued his journey along the famed Trans-Siberian railway.

According to the Washington Post, the Russia has proposed selling surplus electricity produced by this power station to both North and South Korea.

The New York Times also covered the trip to the power station.

UPDATE 2 (2011-8-20): The Washington Post offers some political and economic context of the trip:

Kim’s trip, Pyongyang said, came at the invitation of Medvedev, whose government in recent weeks has pushed North Korea to cooperate on plans to connect a railway and a gas pipeline that would run from Russia through the divided Korean Peninsula.

North Korea has remained largely a no-go zone for massive foreign projects, with outside economic investment allowed only in special development zones. But if North Korea goes along with the gas pipeline project — in which Russian exporter Gazprom will annually send 10 billion cubic meters of gas to South Korea for three decades — it stands to collect handling fees. It would also allow the North a measure of influence in Seoul’s economy.

Some North Korea analysts say that Kim has grown wary of depending so heavily on China, particularly as North Korea prepares for the 100th anniversary next year of the birth of founder Kim Il Sung. The North has promised to build a strong and prosperous economy to mark the occasion, but such a display is largely at the mercy of foreign aid.

“North Korea has had no choice but to deepen its dependence on China, so they now need some counterbalance,” said Yun Duk-min, a professor at Seoul’s Institute of Foreign Affairs and National Security. “Kim Jong Il uses such tactics. This is using Russia to check Chinese influence.”

UPDATE 1 (2011-8-20): KCNA takes the unusual step of confirming KJI is out of the country (rather than waiting until he has returned). According to KCNA:

Kim Jong Il Passes through Khasan Railway Station, Russia
Pyongyang, August 20 (KCNA) — Kim Jong Il, general secretary of the Workers’ Party of Korea and chairman of the National Defence Commission of the DPRK, passed through Khasan, the border railway station of Russia this morning on his way to pay an unofficial visit to Siberia and the Far East Region of the Russian Federation at the invitation of Dmitri Anatoliyevich Medvedev, president of the Russian Federation.

He was greeted at Khasan Railway Station by Viktor Ishayev, presidential envoy to the Far East Region of the Russian Federation, who came to Khasan to conduct him.

He was also greeted by Sergey Darikin, governor of Maritime Territory, Valery Sukhinin, Russian ambassador to the DPRK, Irina Skorobogatova, deputy governor of Maritime Territory, and other senior officials of Moscow, maritime territory, city and district.

When the train pulled in the station, the senior officials got on the train and offered greetings to him.

Medvedev, who has paid deep attention to the Russia-DPRK friendship, dispatched them to greet Kim Jong Il, Viktor Ishayev and other senior officials said, warmly welcoming him to Russia upon the authorization of its President.

Kim Jong Il’s current visit to Russia will mark a historic occasion in putting the Russia-DPRK friendly and cooperative relations onto a fresher and higher stage, they noted.

He said he was very pleased to see for himself the achievements made by the diligent and resourceful Russian people through his current visit, thanking the senior officials of Moscow and local areas and people for warmly greeting him.

He was presented with a souvenir by Sergey Darikin on behalf of the Maritime Territorial Government and people.

After a while, he left for his destination amid send-off by senior officials of Russia.

Prior to it, he left the country to pay an unofficial visit to Siberia and the Far East Region of the Russian Federation.

He is accompanied by Kim Yong Chun, member of the Political Bureau of the WPK Central Committee and minister of the People’s Armed Forces, Kang Sok Ju, member of the Political Bureau of the WPK Central Committee and vice-premier of the Cabinet, Jang Song Thaek, alternate member of the Political Bureau of the WPK Central Committee and vice-chairman of the NDC, Kim Yang Gon, Pak To Chun and Thae Jong Su, alternate members of the Political Bureau and secretaries of the WPK Central Committee, Ju Kyu Chang, alternate member of the Political Bureau and department director of the WPK Central Committee, Pak Pong Ju, first vice department director of the WPK Central Committee, O Su Yong, chief secretary of the North Hamgyong Provincial Committee of the WPK, Kim Kye Gwan, first vice-minister of Foreign Affairs, Kim Yong Jae, DPRK ambassador to Russia, and Sim Kuk Ryong, consul general of the DPRK Consulate General in Nakhodka of Russia.

His visit to Russia, another event in achieving world peace and security and the human cause of independence, will mark a historic occasion in boosting the DPRK-Russia friendship given steady continuity generation after generation and putting strong impetus to the drive of all the servicepersons and people to build a thriving socialist nation.

ORIGINAL POST (2011-8-20): Kim Jong-il has made a “surprise” trip to Russia.  According to the AFP:

North Korea’s reclusive leader Kim Jong-Il on Saturday arrived in his armoured train in Russia and plans to meet President Dmitry Medvedev, the Kremlin said.

During the visit, his first since 2002, Kim is expected to meet with the Kremlin chief for talks in Siberia to discuss North Korea’s nuclear programme, bilateral economic projects and a worsening food crisis in the isolated state.

“A meeting between Russian President Dmitry Medvedev and Kim Jong-ll will be the main event of the visit,” the Kremlin said in a statement, saying Kim would also visit the Far Eastern and Siberian regions.

The Kremlin did not release further details but a local official in the Far East told AFP Kim’s train crossed the border earlier in the day.

Kim, who is known to dislike air travel due to security concerns, arrived in Khasan district after crossing the Tumangan river at 12 pm local time (0100 GMT), Naryzhny said.

He said he was unaware of the North Korean leader’s programme in Russia, adding he did not leave his train upon arrival.

____________

Additional Information:

1. Here is a post on recent DPRK-Russia exchanges leading up to the visit.

2. Here and here are recent stories on DPRK laborers in Russia.

Share